Big Attic

July 2014

I took a few of the crappy snapshots from our first visit to create this makeshift panorama image. 



The stairs obviously need rebuilding.




The plaster is missing from areas where there are leaks. We plan to take it all down and insulate. We were told by our inspector to insulate the attic first and work our way down.




The one area in the house spared of any left over belongings.



 This pointy peaked area of the roof unfortunately can not be seen from the street.


August 2014


We discovered a missing chimney! This chimney leads to the fireplaces in what will be my studio and the guest room.


November 2016
Photos taken by our friend Craig



March 2019 


Here's the attic, all gutted and cleaned out.

June-September 2019
Attic windows replaced




May 2020
Panorama of the attic all gutted and cleaned.

May 2021
Pete repaired the attic stairs.

No comments:

Post a Comment