January 2014
The original downstairs bathroom. We plan to remove this completely and replace it with a half bath on the opposite diagonal corner of the porch.
November/December 2016
This is the new downstairs bathroom, located diagonally from where the old downstairs bathroom was-minus a bathtub.
The sink and toilet are not yet installed in this photograph.
January 2018
Plumbers installing the lines for the bathroom sink, toilet, shower, and washing machine.
Where the toilet will be installed.
Pex pipe and PVC drain line for the shower.
This shower will be removed once a bathroom is installed upstairs.
The first flush!!!!
Our temporary shower
April 2018
April/May 2022