July 2014
This is where the washer and dryer were in the segmented rooms that made up the back porch area
August 2014
Starting the process of removing the many layers of rotted floor. Pete looking discouraged.
A pan of the room
November 2014
View from the old kitchen into what will be our new kitchen.
January 2015
A jerry-rigged method of support for a joist
Really old garbage under the floor
All the trash half cleaned up
The dirt floor clear of debris.
September 2015
Where the washer and dryer once lived
Exterior aluminum siding used for the ceiling
The many many layers of wall, there's even some cork in there!
View from the old kitchen into what will be our new kitchen.
This window looks on to our backyard.
What seemed like the endless process of pulling layers off the floor.
Extensive termite damage under all the layers
The chimney from the back. The whole in the center is from where someone vented it, where I assume a wood burning heat or cook stove once stood.
A few of the many samples of vinyl flooring.
Strips of vinyl printed with a brick pattern nailed to the ceiling, maybe used for spacers.
May 2015
All the layers FINALLY removed!!
The seven foot deep pit found under the floor.
July 2015
Foundation stones from the inside of the house
A jerry-rigged method of support for a joist
Here's what the floor was sitting on!
A flower pot shoved into an old drainage pipe
All the trash half cleaned up
The dirt floor clear of debris.
September 2015
We bought this Elmira stove second hand from Ebay. Pete's brother helped up load it into the house,
June 2016
Pete measuring the wonky joists with his new laser level
November-December 2016
This vapor barrier plastic was installed under the joists to keep out moisture.
The first of the new joists installed
All of the joists installed
Plywood floor installed
February 2017
Doors installed between old and new kitchen
June 2017
The first installed outlet in the house, was this one in our kitchen.April 2018
Our temporary kitchen slop sink was installed!
Our very rudimentary kitchen
Amazon.com. for
With some struggle, Pete managed to install this gas heater by himself, after two contractors blew us off.
Setting up for the installation in the kitchen. We had to go back to Lowe's a second time for the correct parts.
It was stressful trying to get this thing working! In the end there was a standard flat screw on the bottom of the unit that needed to be adjusted to get the pilot to light. There was nothing in the directions about it, it wasn't obvious at all!
November 2019
December 2019
The first radiator in the house was installed in the kitchen. Pete want able to paint the segments on time.
June 2020
June 2020
July 2021
July 2022
Pete and Joe installed two second hand Andersen windows on the driveway side in the kitchen.
Cutting the hole for reframing